Pavement Management Program
The Town's Pavement Management Program strives to make the most effective use of our resources to preserve and upgrade the overall condition of our streets.
Danville’s Pavement Management Program is a strategic, multi-year plan used to assess and maintain the Town’s roadway network in a cost-effective manner. It involves collecting and analyzing pavement data, prioritizing maintenance and repairs based on road conditions, and allocating resources accordingly. The goal is to ensure roads are safe, durable, and well-maintained over their lifespan. A proactive approach to pavement maintenance prevents more costly pavement repairs in the future.
The Town uses Metropolitan Transportation Commission (MTC) software to track pavement conditions and maintenance history for all public streets. This system generates a Pavement Condition Index (PCI), which rates roads on a scale from 0 to 100, where new streets begin at 100 and scores decline with age and wear. Each year, the Town performs pavement maintenance based on available funding. Streets are selected for treatment based on PCI scores, location, and the type of repair needed. Common maintenance treatments include:
- Slurry Seal: A thin layer of asphalt mixed with sand or rock chips
- Rubberized Cape Seal: A two-step process combining chip seal and slurry
- Asphalt Overlay: A 1–4 inch layer of hot asphalt applied to the surface
Currently, the Town's streets have an overall network PCI rating of 78, which is considered a "Good to Excellent" condition rating.
To maximize efficiency and cost savings, streets requiring similar treatments are grouped together in projects. The Town Council’s goal is to maintain an average PCI of 70 with an annual investment of approximately 6.6 million dollars.
The Town's Pavement Management Program strives to make the most effective use of our resources to preserve and upgrade the overall condition of our streets.
Danville’s Pavement Management Program is a strategic, multi-year plan used to assess and maintain the Town’s roadway network in a cost-effective manner. It involves collecting and analyzing pavement data, prioritizing maintenance and repairs based on road conditions, and allocating resources accordingly. The goal is to ensure roads are safe, durable, and well-maintained over their lifespan. A proactive approach to pavement maintenance prevents more costly pavement repairs in the future.
The Town uses Metropolitan Transportation Commission (MTC) software to track pavement conditions and maintenance history for all public streets. This system generates a Pavement Condition Index (PCI), which rates roads on a scale from 0 to 100, where new streets begin at 100 and scores decline with age and wear. Each year, the Town performs pavement maintenance based on available funding. Streets are selected for treatment based on PCI scores, location, and the type of repair needed. Common maintenance treatments include:
- Slurry Seal: A thin layer of asphalt mixed with sand or rock chips
- Rubberized Cape Seal: A two-step process combining chip seal and slurry
- Asphalt Overlay: A 1–4 inch layer of hot asphalt applied to the surface
Currently, the Town's streets have an overall network PCI rating of 78, which is considered a "Good to Excellent" condition rating.
To maximize efficiency and cost savings, streets requiring similar treatments are grouped together in projects. The Town Council’s goal is to maintain an average PCI of 70 with an annual investment of approximately 6.6 million dollars.
-
Sycamore Valley Road Repaving Underway
Share Sycamore Valley Road Repaving Underway on Facebook Share Sycamore Valley Road Repaving Underway on X (formerly Twitter) Share Sycamore Valley Road Repaving Underway on Linkedin Email Sycamore Valley Road Repaving Underway link
One of Danville’s largest pavement projects in recent years is now underway on Sycamore Valley Road.
Crews are repaving approximately 1.3 miles of Sycamore Valley Road, from Camino Tassajara to the I-680 area. The project covers approximately 500,000 square feet of pavement, including all travel lanes, bike lanes and shoulders.
Work began earlier this week and is expected to be completed by the end of October, weather permitting, followed by final striping once the new pavement has fully set.
What to Expect
Sycamore Valley Road varies from four to eight lanes along the project area, so crews will work along the roadway one lane at a time along the entire . The repaving process includes several steps:
- Grinding: Crews remove the top few inches of existing pavement.
- Recycling the roadway: Using a process called Cold-in-Place recycling, crews grind additional existing asphalt, recycle it on site, and compact it to create a strong base for the new roadway. By reusing existing pavement material in place, this process reduces the amount of material that needs to be hauled away and the amount of new material needed for construction, making it a more sustainable approach to roadway rehabilitation.
- New pavement: A new top layer of asphalt is installed.
- Striping: Once the pavement has fully set, crews will return to complete final roadway/bike lane striping.
Work will generally take place between 8 a.m. and 5 p.m. One lane will be closed in the active work area, but Sycamore Valley Road will remain open in both directions throughout the project. Drivers should expect delays and allow extra time when traveling through the area.
Sycamore Valley Road is one of Danville’s lowest-rated major streets based on its Pavement Condition Index (PCI), which is used to evaluate roadway conditions and prioritize pavement maintenance. This project represents a significant investment in one of the Town’s major roadways and will provide a smoother, refreshed roadway for drivers and cyclists.
One of Danville’s largest pavement projects in recent years is now underway on Sycamore Valley Road.
Crews are repaving approximately 1.3 miles of Sycamore Valley Road, from Camino Tassajara to the I-680 area. The project covers approximately 500,000 square feet of pavement, including all travel lanes, bike lanes and shoulders.
Work began earlier this week and is expected to be completed by the end of October, weather permitting, followed by final striping once the new pavement has fully set.
What to Expect
Sycamore Valley Road varies from four to eight lanes along the project area, so crews will work along the roadway one lane at a time along the entire . The repaving process includes several steps:
- Grinding: Crews remove the top few inches of existing pavement.
- Recycling the roadway: Using a process called Cold-in-Place recycling, crews grind additional existing asphalt, recycle it on site, and compact it to create a strong base for the new roadway. By reusing existing pavement material in place, this process reduces the amount of material that needs to be hauled away and the amount of new material needed for construction, making it a more sustainable approach to roadway rehabilitation.
- New pavement: A new top layer of asphalt is installed.
- Striping: Once the pavement has fully set, crews will return to complete final roadway/bike lane striping.
Work will generally take place between 8 a.m. and 5 p.m. One lane will be closed in the active work area, but Sycamore Valley Road will remain open in both directions throughout the project. Drivers should expect delays and allow extra time when traveling through the area.
Sycamore Valley Road is one of Danville’s lowest-rated major streets based on its Pavement Condition Index (PCI), which is used to evaluate roadway conditions and prioritize pavement maintenance. This project represents a significant investment in one of the Town’s major roadways and will provide a smoother, refreshed roadway for drivers and cyclists.
-
2025/26 Pavement Slurry Seal Project (CIP C-610J)
Share 2025/26 Pavement Slurry Seal Project (CIP C-610J) on Facebook Share 2025/26 Pavement Slurry Seal Project (CIP C-610J) on X (formerly Twitter) Share 2025/26 Pavement Slurry Seal Project (CIP C-610J) on Linkedin Email 2025/26 Pavement Slurry Seal Project (CIP C-610J) link
The 2025/26 Pavement Slurry Seal Project (CIP No. C-610J) will apply slurry seal surface treatment to various streets throughout the Town. Slurry seal is a cost-effective preventative maintenance technique designed to extend the life of existing pavements by filling surface cracks and voids, providing a weather-tight seal, and adding texture and uniform appearance to the street. A slurry seal will extend pavement life by approximately five to seven years.
Public notices were mailed out to all affected residences 10 days in advance of construction work beginning in June. These notices contain the scope of work, scheduling of the work, and contact information for the contractor’s superintendent. Additionally, parking restriction A-frame signs are placed 72 hours in advance of any work starting in each area. These signs detail the exact date and time that the area will be resurfaced.
Construction began at the end of June 2026 with crack sealing and dig-out repairs. Slurry seal resurfacing work began the third week of July in the east end of Town in the Lawrence Road area. The slurry seal portion of the project is expected to last four weeks and will be followed with traffic striping and pavement marking replacement. Overall project completion is anticipated by the second week of August 2026.
To view the 2025/26 Pavement Slurry Seal Schedule and Street Maps, use the links listed below:
- Week 1 Type 1 Slurry Schedule
- Week 2 Type 1 Slurry Schedule
- Week 3 Type 1 Slurry Schedule
- Week 4 Type 2 Slurry Schedule
If you have any questions regarding this project, please contact the Town of Danville Engineering Division using the information below. We appreciate your patience as we work to preserve the quality of our roads.
Development Services Department
(925) 314-3310
Bruce Swenson
Town of Danville Civil Engineering Associate
The 2025/26 Pavement Slurry Seal Project (CIP No. C-610J) will apply slurry seal surface treatment to various streets throughout the Town. Slurry seal is a cost-effective preventative maintenance technique designed to extend the life of existing pavements by filling surface cracks and voids, providing a weather-tight seal, and adding texture and uniform appearance to the street. A slurry seal will extend pavement life by approximately five to seven years.
Public notices were mailed out to all affected residences 10 days in advance of construction work beginning in June. These notices contain the scope of work, scheduling of the work, and contact information for the contractor’s superintendent. Additionally, parking restriction A-frame signs are placed 72 hours in advance of any work starting in each area. These signs detail the exact date and time that the area will be resurfaced.
Construction began at the end of June 2026 with crack sealing and dig-out repairs. Slurry seal resurfacing work began the third week of July in the east end of Town in the Lawrence Road area. The slurry seal portion of the project is expected to last four weeks and will be followed with traffic striping and pavement marking replacement. Overall project completion is anticipated by the second week of August 2026.
To view the 2025/26 Pavement Slurry Seal Schedule and Street Maps, use the links listed below:
- Week 1 Type 1 Slurry Schedule
- Week 2 Type 1 Slurry Schedule
- Week 3 Type 1 Slurry Schedule
- Week 4 Type 2 Slurry Schedule
If you have any questions regarding this project, please contact the Town of Danville Engineering Division using the information below. We appreciate your patience as we work to preserve the quality of our roads.
Development Services Department
(925) 314-3310
Bruce Swenson
Town of Danville Civil Engineering Associate
-
Final Design Complete
Pavement Management Program has finished this stageDecember 2025 – Final Design Phase complete. Bid specification documents prepared and scope of work established.
-
Bid Publication on the Town of Danville Website
Pavement Management Program has finished this stageJanuary 15, 2026 – Bid for CIP No. C-610J: 2025/26 Pavement Slurry Seal Project is published on the Town of Danville website.
-
Live Bid Opening
Pavement Management Program has finished this stageFebruary 12, 2026 – Live Bid opening for CIP C-610J. A total of seven bid proposals were received.
-
Award of Contract
Pavement Management Program has finished this stageMarch 3, 2026 – The Danville Town Council awards the CIP C-610J construction contract to American Pavement Systems Inc. at the March 3, 2026, Town Council meeting.
-
Construction
Pavement Management Program is currently at this stageJune-August 2026 – Construction begins at the end of June 2026 with crack sealing and dig-out repairs. Slurry seal resurfacing work begins the third week of July in the east end of Town in the Lawrence Road area. The slurry seal portion of the project is expected to last four weeks and will be followed with traffic striping and pavement marking replacement.
-
Project is Complete
this is an upcoming stage for Pavement Management ProgramOverall project completion is anticipated by the second week of August 2026.
-
FY 2026-27 Budget and Capital Improvement Program (49.5 MB) (pdf)
-
CIP C-610J 2025-26 Pavement Slurry Seal Project COMPLETE BID SET (21.4 MB) (pdf)
-
CIP C-610J 2025-26 Pavement Slurry Seal Project Addendum No. 1 (158 KB) (pdf)
-
CIP C-610J - Official Bid Results Summary (93.1 KB) (pdf)
-
Award of Contract - March 3 2026 Town Council Meeting Item 6.3 (5.62 MB) (pdf)
-
Town Council Resolution 18-2026 Authorizing Award of Contract for CIP C-610J (76.5 KB) (pdf)
-
Public Notice - 2025-26 Pavement Slurry Seal Project CIP C-610J (149 KB) (pdf)
-
Week 1 Type 1 Slurry Schedule - Danville 2025-26 Pavement Slurry Seal Project (499 KB) (pdf)
-
Week 2 Type 1 Slurry Schedule - Danville 2025-26 Pavement Slurry Seal Project (580 KB) (pdf)
-
Week 3 Type 1 Slurry Schedule - Danville 2025-26 Pavement Slurry Seal Project (481 KB) (pdf)
-
Week 4 Type 2 Slurry Schedule - Danville 2025-26 Pavement Slurry Seal Project (413 KB) (pdf)