425 El Pintado (Darby Plaza)

A preliminary housing development application (DEV23-0016) has been submitted by 425 EP Investments LLC for a 4-story multifamily senior housing condominium. The proposed development would include approximately 100 units spread across three main stories, a partial penthouse level, and select units in the garage/basement. The subject 3.17-acre site was redesignated to Residential-Multifamily, allowing 30-35 units per acre as part of the Town's 2023-2031 Housing Element adoption process in January 2023.

101923 Project Plans

Updated Plan - November 2024

Update November 8, 2024

Public Hearing Administrative Staff Report and Resolution for November 12,2024

Update October 30, 2024

Public Hearing Notice
Planning Commission regular meeting date November 12, 2024 - Planning Commission Public Hearing Notice

Traffic Impact Analysis and Stormwater Control Plan Report

Project Renderings

Applicant Statement and State Density Bonus Law Request Outline

Update September 10, 2024

Below is a link to additional three-dimensional architectural drawings of the proposed development. These plans help to better understand the project siting and architecture.

091024 - Three-Dimensional Architectural Drawings

Update August 15, 2024

On August 15, 2024, 425 EP Investments LLC submitted updated project plans to the Design Review Board to reflect recent modifications.

081524 Project Plans

Update August 8, 2024

In preparation for the August 15, 2024 Design Review Board meeting, the applicant has submitted revised architectural plans. The revisions include pulling back the fourth floor units on the rear elevations to reduce the mass as viewed from the north. The new patio areas include vegetation to help screen that portion of the buildings.

01-240718 - Entitlement Package DWG Revision

Update June 19, 2024

On June 13, 2024, the development plan request for 425 El Pintado Road went to the Design Review Board for consideration of the 99-unit age restricted senior condominium development. Following review the submitted plans, the Design Review Board continued the item to a future meeting with the request for some modifications.

061324 - DRB Updated Project Plans

Update March 14, 2024

On March 14, 2024, 425 EP Investments LLC submitted updated project plans to reflect feedback received on the preliminary application.

031424 - Updated Project Plans

Share 425 El Pintado (Darby Plaza) on Facebook Share 425 El Pintado (Darby Plaza) on Twitter Share 425 El Pintado (Darby Plaza) on Linkedin Email 425 El Pintado (Darby Plaza) link
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Submitting your comment
Cancel
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>