600 Hartz Ave

On May 10, 2022, the Danville Planning Commission reviewed and approved this development proposal for a new two-story mixed-use building. Once complete, it will feature 37 condominium units on the second floor, commercial retail space on the first floor (street level) and a subterranean garage.

Because of the excavation necessary to build the underground garage, the redwood trees along the Hartz Avenue street frontage will be removed. While the redwood trees located along the creek are planned to be retained, the drought has caused many of the redwoods to deteriorate to a point that may necessitate removal to protect surrounding properties.

The analyses of the development proposal, along with all key documents, can be found in the Document Library located on this project page.

July 1, 2024 UPDATE

Construction of this development is progressing and most of the framing and wall construction is complete. Construction of the 4,000 square foot commercial building area along the Hartz Avenue frontage is also under construction. The builder is hoping to complete the building by late 2024 or early 2025.

March 02, 2023 UPDATE

The project developer has submitted a grading permit application for 600 Hartz Avenue. Grading preparation of the site will begin on March 5, 2023, including demolition of the remainder of the building and tree stumps, preparing the site, and mobilizing equipment. Excavation and grading are scheduled to start on March 15, 2023, and last approximately one month.

The off-haul route will turn left from the site onto Hartz Avenue to San Ramon Valley Boulevard. Trucks will be frequently entering and exiting the site -- and motorists, cyclists, and pedestrians should use caution when traveling through the area and be mindful of posted construction signage and traffic control personnel present at the site.

October 27, 2022 UPDATE

The project developer has submitted a Demolition Permit to clear the project site beginning November 7, 2022. Once the site has been cleared, construction is expected to begin in winter 2023, weather permitting.

Excavation required to construct the basement parking preclude the ability to work around many of the redwood trees on the property. Therefore, demolition will involve tree removal, including redwood trees along Hartz Avenue. The developer will be mitigating this loss by planting trees offsite within Town parks or open space. This would be in addition to the landscaping on the project site. Further, the removed trees will be salvaged by a family-owned demolition company that specializes in repurposing and recycling lumber.

May 10, 2022 UPDATE

Danville Planning Commission reviewed and approved a proposal to construct a new 51,290 square foot two-story mixed-use building on a 1.19 -acre site. The proposed development includes 37 residential condominium units totaling 46,680 square feet, and 3,920 square feet of commercial retail space along the Hartz Avenue frontage. The proposed project includes a 31,360 square foot subterranean parking garage.

The Planning Commission’s approval followed an in-depth process that included an initial joint study session with the Danville Town Council in late 2020 and two detailed reviews by the Design Review Board (DRB) in 2022 to ensure the new building integrated with the existing fabric of the community.

October 28, 2021

Town received a planning application to develop a mixed-use building consisting of residential units (second floor) and commercial (first floor) at the site of the current FAZ Restaurant (1.19 acres).

Share 600 Hartz Ave on Facebook Share 600 Hartz Ave on Twitter Share 600 Hartz Ave on Linkedin Email 600 Hartz Ave link
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Submitting your comment
Cancel
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>